U.S. Energy Information Administration logo
Skip to sub-navigation

Construction cost data for electric generators installed in 2022

Release Date: September 24, 2024 Next Release Date: September 2025 2022 TablesXLS

Presented below are graphs and tables of the cost data for generators installed in 2021 based on data collected by the 2021 Annual Electric Generator Report, Form EIA-860. The cost data for certain generation technologies were omitted to avoid disclosure of individual company data.

EIA expects to publish construction cost data for generators installed in 2022 in September 2024.

Read EIA's Electric Power Data Guide.

Previous years:

Presented below are graphs and tables of the cost data for generators installed in 2022 based on data collected by the 2022 Annual Electric Generator Report, Form EIA-860. The cost data for certain generation technologies were omitted to avoid disclosure of individual company data.

EIA expects to publish construction cost data for generators installed in 2023 in September 2025.

Read EIA's Electric Power Data Guide.

Jump to group:

By selected sources and type:

Generators installed in 2022 by major energy source







1,588 1,451 820 1,205 2,084
All plants by major energy source capacity-weighted average cost ($/kW)
solar 1,588
wind 1,451
natural gas 820
battery storage 1,205
petroleum liquids 2,084
10,285 424 7,455 197 3,941 1,478 2,945 557 15 38
Total capacity (MW) at new plants at existing plants
solar 10,285 424
wind 7,455 197
natural gas 3,941 1,478
battery storage 2,945 557
petroleum liquids 15 38
381 8 33 1 18 12 80 17 4 18
Number of plants at new plants at existing plants
solar 381 8
wind 33 1
natural gas 18 12
battery storage 80 17
petroleum liquids 4 18
All plants by major energy source total cost (billion $)
solar 17.0
wind 11.1
natural gas 4.4
battery storage 4.2
petroleum liquids 0.1
Number of generators by major energy source at new plants at existing plants
solar 392 13
wind 36 1
natural gas 55 21
battery storage 84 20
petroleum liquids 6 26
Average new plants capacity or additional capacity at existing plants at new plants at existing plants
solar 27 53
wind 226 197
natural gas 219 123
battery storage 37 33
petroleum liquids 4 2

Generators installed in 2022 by prime mover






Capacity-weighted average cost per kilowatt of installed namepate capacity ($/kW) capacity weighted-average cost ($/kW)
combustion turbine 864
combustion turbine (as part of combined cycle) 764
steam turbine (as part of combined cycle) 802
internal combustion engine 1,788
onshore wind turbine 1,451
photovoltaic 1,588
energy storage, battery 1,205
Total included capacity(MW) at new plants at existing plants
combustion turbine 924 259
combustion turbine (as part of combined cycle) 1,889 774
steam turbine (as part of combined cycle) 1,031 401
internal combustion engine 112 82
onshore wind turbine 7,455 197
photovoltaic 10,285 424
energy storage, battery 2,945 557
number of generators at new plants at existing plants
combustion turbine 18 7
combustion turbine (as part of combined cycle) 6 2
steam turbine (as part of combined cycle) 3 1
internal combustion engine 34 37
onshore wind turbine 36 1
photovoltaic 392 13
energy storage, battery 84 20
Average generator capacity at new or existing plants at new plants at existing plants
combustion turbine 51 37
combustion turbine (as part of combined cycle) 315 387
steam turbine (as part of combined cycle) 344 401
internal combustion engine 3 2
onshore wind turbine 207 197
photovoltaic 26 33
energy storage, battery 35 28
Total construction cost total cost (billion $)
combustion turbine 1.0
combustion turbine (as part of combined cycle) 2.0
steam turbine (as part of combined cycle) 1.1
internal combustion engine 0.3
onshore wind turbine 11.1
photovoltaic 17.0
energy storage, battery 4.2

Generators installed in 2022 by Census region







Census regions capacity-weighted average cost ($/kW)
South 1,273
West 1,444
Midwest 1,290
Northeast 2,430
Total included capacity at new plants at existing plants
South 14,257 153
West 5,984 1,091
Midwest 3,745 1,429
Northeast 656 22
Number of plants at new plants at existing plants
South 167 3
West 119 30
Midwest 93 12
Northeast 137 11
Number of generators at new plants at existing plants
South 201 3
West 124 47
Midwest 105 19
Northeast 143 12
Average new plant or additional capacity at existing plants at new plants at existing plants
South 85 51
West 50 36
Midwest 40 119
Northeast 5 2
Census region total cost (billion $)
South 18.4
West 10.2
Midwest 6.7
Northeast 1.6

Generators installed in 2022 by top five states in capacity additions







State capacity-weighted average cost ($/kW)
Texas 1,224
California 1,460
Michigan 986
Florida 970
Virginia 1,778
Total included capacity at new plants at existing plants
Texas 8,831 78
California 3,910 658
Michigan 1,759 1,203
Florida 2,607 74
Virginia 656 0
Number of plants at new plants at existing plants
Texas 54 1
California 69 9
Michigan 9 2
Florida 21 1
Virginia 11 0
Number of generators at new plants at existing plants
Texas 83 1
California 73 16
Michigan 14 6
Florida 25 1
Virginia 11 0
Average new plant or additional capacity at existing plants at new plants at existing plants
Texas 164 78
California 57 73
Michigan 195 601
Florida 124 74
Virginia 60 0
State total cost (billion $)
Texas 10.9
California 6.7
Michigan 2.9
Florida 2.6
Virginia 1.2

Natural gas generators installed in 2022 by technology







Natural gas plants by type capacity-weighted average cost ($/kW)
combined cycle 722
combustion turbine 1,006
internal combustion engine 1,677
Total included capacity (MW) at new plants at existing plants
combined cycle 2,715 1,174
combustion turbine 1,129 259
internal combustion engine 97 45
Number of plants at new plants at existing plants
combined cycle 2 1
combustion turbine 6 4
internal combustion engine 10 7
Number of generators at new plants at existing plants
combined cycle 9 3
combustion turbine 18 7
internal combustion engine 28 11
Average new plants capacity or additional capacity at existing plants at new plants at existing plants
combined cycle 1,358 1,174
combustion turbine 188 65
internal combustion engine 10 6
Total construction cost total cost (billion $)
combined cycle 2.8
combustion turbine 1.4
internal combustion engine 0.2

Natural gas generators installed in 2022 at combined-cycle plants by prime mover






Natural gas combined cycle plants by component capacity-weighted average cost ($/kW)
combustion turbine 764
steam turbine 802
Total capacity at new plants at existing plants
combustion turbine 1,889 774
steam turbine 1,031 401
Number of generators at new plants at existing plants
combustion turbine 6 2
steam turbine 3 1
Average new plant or additional capacity at existing plants at new plants at existing plants
combustion turbine 315 387
steam turbine 344 401
Natural gas generators at combined-cycle plants by prime mover total cost (billion $)
combustion turbine 2.0
steam turbine 1.1

Solar PV generators installed in 2022 by Census region







Census regions capacity-weighted average cost ($/kW)
South 1,505
West 1,549
Midwest 1,784
Northeast 2,409
Total included capacity at new plants at existing plants
South 5,742 74
West 3,097 348
Midwest 908 0
Northeast 539 1
Number of plants at new plants at existing plants
South 112 1
West 84 6
Midwest 73 0
Northeast 112 1
Number of generators at new plants at existing plants
South 117 1
West 85 11
Midwest 74 0
Northeast 116 1
Average new plant or additional capacity at existing plants at new plants at existing plants
South 51 74
West 37 58
Midwest 12 0
Northeast 5 1
Region total cost (billion $)
South 8.8
West 5.3
Midwest 1.6
Northeast 1.3

Solar PV generators installed in 2022 by top five states in capacity additions






Census regions capacity-weighted average cost ($/kW)
Texas 1,310
California 1,627
Florida 1,377
Virginia 1,795
Georgia 1,975
Total included capacity at new plants at existing plants
Texas 2,278 0
California 1,848 250
Florida 1,140 74
Virginia 646 0
Georgia 545 0
Number of plants at new plants at existing plants
Texas 15 0
California 43 1
Florida 17 1
Virginia 10 0
Georgia 7 0
Number of generators at new plants at existing plants
Texas 17 0
California 44 4
Florida 19 1
Virginia 10 0
Georgia 7 0
Average new plant or additional capacity at existing plants at new plants at existing plants
Texas 152 0
California 43 250
Florida 67 74
Virginia 65 0
Georgia 78 0
State total cost (billion $)
Texas 3.0
California 3.4
Florida 1.7
Virginia 1.2
Georgia 1.1

Solar PV generators installed in 2022 by PV panel type and tracking system







Solar PV plants by tracking system capacity-weighted average cost ($/kW)
crystalline silicon,
fixed tilt
1,788
crystalline silicon,
axis-based tracking
1,605
thin-film CdTe,
fixed tilt
1,249
thin-film CdTe, axis-based tracking 1,561
other 1,386
Total included capacity at new plants at existing plants
crystalline silicon,
fixed tilt
1,056 6
crystalline silicon,
axis-based tracking
5,068 418
thin-film CdTe,
fixed tilt
385 0
thin-film CdTe, axis-based tracking 3,349 0
other 427 0
Number of plants at new plants at existing plants
crystalline silicon,
fixed tilt
121 2
crystalline silicon,
axis-based tracking
190 6
thin-film CdTe,
fixed tilt
10 0
thin-film CdTe, axis-based tracking 40 0
other 20 0
Number of generators at new plants at existing plants
crystalline silicon,
fixed tilt
128 4
crystalline silicon,
axis-based tracking
192 9
thin-film CdTe,
fixed tilt
10 0
thin-film CdTe, axis-based tracking 42 0
other 20 0
Average new plant or additional capacity at existing plants at new plants at existing plants
crystalline silicon,
fixed tilt
9 3
crystalline silicon,
axis-based tracking
27 70
thin-film CdTe,
fixed tilt
38 0
thin-film CdTe, axis-based tracking 84 0
other 21 0
Solar PV plants by tracking system total cost (billion $)
crystalline silicon,
fixed tilt
1.9
crystalline silicon,
axis-based tracking
8.8
thin-film CdTe,
fixed tilt
0.5
thin-film CdTe, axis-based tracking 5.2
other 0.6

Solar PV generators installed in 2022 by total added capacity at plant







Plant size capacity-weighted average cost ($/kW)
1–5 MW 2,555
5–10 MW 2,000
10–100 MW 1,544
100–500 MW 1,483
Total included capacity at new plants at existing plants
1–5 MW 707 10
5–10 MW 193 0
10–100 MW 3,962 164
100–500 MW 5,423 250
Number of plants at new plants at existing plants
1–5 MW 250 4
5–10 MW 26 0
10–100 MW 74 3
100–500 MW 31 1
Number of generators at new plants at existing plants
1–5 MW 255 6
5–10 MW 29 0
10–100 MW 76 3
100–500 MW 32 4
Average new plant or additional capacity at existing plants at new plants at existing plants
1–5 MW 3 3
5–10 MW 7 0
10–100 MW 54 54
100–500 MW 175 250
Plant size total cost (billion $)
1–5 MW 1.8
5–10 MW 0.4
10–100 MW 6.4
100–500 MW 8.4

Wind generators installed in 2022 by Census region







Census region capacity-weighted average cost ($/kW)
South 1,395
Midwest and Northeast 1,686
West 1,407
Total included capacity at new plants at existing plants
South 5,496 0
Midwest and Northeast 1,234 197
West 725 0
Number of plants at new plants at existing plants
South 16 0
Midwest and Northeast 12 1
West 5 0
Number of generators at new plants at existing plants
South 17 0
Midwest and Northeast 13 1
West 6 0
Average new plant or additional capacity at existing plants at new plants at existing plants
South 343 0
Midwest and Northeast 103 197
West 145 0
Census region total cost (billion $)
South 7.7
Midwest and Northeast 2.4
West 1.0

Wind generators installed in 2022 by plant size







Plant size capacity-weighted average cost ($/kW)
1–100 MW 1,806
100–200 MW 1,614
>200 MW 1,402
Total included capacity at new plants at existing plants
1–100 MW 210 0
100–200 MW 1,153 197
>200 MW 6,092 0
Number of plants at new plants at existing plants
1–100 MW 8 0
100–200 MW 8 1
>200 MW 17 0
Number of generators at new plants at existing plants
1–100 MW 10 0
100–200 MW 8 1
>200 MW 18 0
Average new plant or additional capacity at existing plants at new plants at existing plants
1–100 MW 26 0
100–200 MW 144 197
>200 MW 358 0
Plant size total cost (billion $)
1–100 MW 0.4
100–200 MW 2.2
>200 MW 8.5

Wind generators installed in 2022 by wind class







Class capacity-weighted average cost ($/kW)
Class 1 1,463
Class 2 1,463
Class 3 and 4 1,424
Total included capacity at new plants at existing plants
Class 1 950 0
Class 2 4,298 0
Class 3 and 4 2,208 197
Number of plants at new plants at existing plants
Class 1 5 0
Class 2 17 0
Class 3 and 4 11 1
Number of generators at new plants at existing plants
Class 1 5 0
Class 2 19 0
Class 3 and 4 12 1
Average new plant or additional capacity at existing plants at new plants at existing plants
Class 1 190 0
Class 2 253 0
Class 3 and 4 201 197
Plant size total cost (billion $)
Class 1 1.4
Class 2 6.3
Class 3 and 4 3.4

Notes:
  • Data includes facilities with a total generator nameplate capacity of 1 megawatt (MW) or more. Solar data does not include distributed generation capacity.
  • Government grants, tax benefits, or other incentives are excluded from these costs.
  • Solar photovoltaic (PV) data are based on reported alternating current (AC) capacity and may differ from other cost and capacity estimates that use direct current (DC) ratings of PV panels.
  • Petroleum liquids includes distillate fuel oil, jet fuel, kerosene, residual fuel oil, and waste oil.
  • Biomass includes both liquid and gaseous biomass fuels.
  • Some generation technologies were excluded from this analysis to avoid disclosure of individual company data.
  • Average construction cost is based on the nameplate capacity weighted average cost per kilowatt of installed nameplate capacity.
  • Total capacity is the sum of the nameplate capacity of generators included in each group.
  • Average new capacity is based on the nameplate capacity of new plants or new additions of nameplate capacity to existing plants. New plants did not previously have operable units and are typically recently constructed. Existing plants have at least one previously operable generator and are not newly constructed.
  • Totals may not equal sum of components due to independent rounding.

Data source: U.S. Energy Information Administration, Form EIA-860, Annual Electric Generator Report