Background Reference: Ecuador
Overview
Resource nationalism and debates about the economic, strategic, and environmental implications of oil sector development are prominent issues in Ecuadorian politics. Ecuador has a challenging investment environment prompted by government initiatives to increase the share of crude oil revenue for the country. In addition, there is a long history of debt defaults, corruption, and a lack of investment-suited infrastructure projects that meet international standards for transparency and competitiveness. These factors have contributed to near-stagnant oil production, as output has stayed relatively constant over the past decade. A lack of sufficient domestic refining capacity to meet local demand has necessitated imports of refined products, limiting net oil revenue.
Acknowledging its heavy reliance on the oil sector and uncertain crude oil price conditions, Ecuador’s government released its energy plan, the National Energy Agenda 2016–2040, in October 2016 (most current edition). Policies in the Agenda are designed to transition Ecuador’s energy sector to a more diversified energy matrix. The Agenda defines five major strategic objectives:
- An integrally planned, fair and inclusive energy sector
- A diversified, renewable, and sustainable energy matrix
- Energy sovereignty and security with quality energy supply for the entire population
- Increased energy efficiency
- Regional energy integration and contribution to sustainable global energy development.1,2
Petroleum and Other Liquids
Sector organization
Hydrocarbon resources are exclusively owned by the state, and until recently, Ecuador limited foreign investment in the oil sector. State-owned oil companies account for most of the production. In 2018, President Moreno ordered the merger of the Ministry of Hydrocarbons, Hydrocarbons Secretariat, and the Ministry of Electricity and Ministry of Mines, creating the Ministry of Energy and Non-renewable Resources (MERNNR). MERNNR is in charge of carrying out hydrocarbons policies and is responsible for executing, amending, and administering areas and oil contracts, as well as the country's hydrocarbon resources. In 2020, President Moreno ordered the merger of the Mining Regulation and Control Agency, the Electricity Regulatory and Control Agency, and the Hydrocarbon Regulatory Agency. As a result of this merger, a single entity called Agency for Regulation and Control of Energy and Non-Renewable Natural Resources (ARCH) formed.
State-owned Petroecuador is responsible for downstream oil operations, including refining, marketing, and pipelines, while state-owned Petroamazonas is the main state exploration and production company. In 2018, the government announced it would merge state-owned companies Petroecuador and Petroamazonas into a single entity (both now known as Petroecuador) as part of a broad multi-year plan to reduce bureaucracy and cut public spending. The merger was finalized in 2021. Under this model, some of Petroecuador’s stock will be listed on international equity markets, similar to other recent privatizations of state-oil companies such as Brazil’s Petrobras and Colombia’s Ecopetrol. The government expects that this mixed state-private company model will allow Petroecuador easier access to international capital markets for funding oil projects.3 The government estimated that in 2020 the new state-led merged company delivered 80% of total oil production in Ecuador (350,000–400,000 barrels per day [b/d] with private companies producing around 100, 000 b/d).4,5
Ecuador has significant sovereign debt obligations. As of 2020, media sources estimated that Ecuador owed $65 billion in foreign debt.6 Since 2009, Ecuador has agreed to several oil-for-loan deals with China that explicitly guarantee oil exports to China in exchange for loans. The loans also require Ecuador to invest a share of the loaned amount into projects involving Chinese companies. Some of these funds have been used for construction of hydroelectric complexes and other energy-related projects. According to a 2018 New York Times report, China had provided more than $19 billion to Ecuador.7 In 2020, the remaining loans were restructured, with almost 200 million barrels of outstanding oil supply still owed to China. In 2020, the International Monetary Fund provided Ecuador with a $6.5 billion loan.8 In early 2021, the U.S. International Development Finance Corporation lent Ecuador $2.8 billion to repay part of its loans to China in exchange for Ecuador’s agreement to exclude Chinese companies from its telecommunication networks.9 In June 2021, the Ministry of Economy and Finance reported that over $5 billion in loans to China were still outstanding as of 2019.10
Ecuador was one of two South American member countries in the OPEC and originally joined the organization in 1973. The country voluntarily suspended its membership in 1992, becoming the first country to withdraw from OPEC, then rejoined in 2007. Before it withdrew from OPEC on January 1, 2020, Ecuador’s production (2019) ranked eleventh among the 14 OPEC members. According to Ecuador’s government, the country’s decision to withdraw its OPEC membership was part of the government’s rigorous plan to reduce public spending, promote public-private partnerships, and implement more market-friendly economic policies to generate new income.11
In 2018, the Moreno administration reintroduced oil production sharing contracts (PSCs) after switching away from PSCs to a flat-fee service contract model in 2010. PSCs were reintroduced in an effort to attract more foreign investment in the oil sector. The Productive Development Law contained tax incentives to spur investment, changed tax and regulatory policies for mining, and issued new Public-Private Partnership regulations to increase private investment in infrastructure projects. The Ecuadorian government held a successful public tender for oil production-sharing contracts (Intracampos I) in 2019 and reportedly plans to move to production-sharing contracts as the standard for future tenders.12
In July 2021, Ecuador’s President Guillermo Lasso signed Executive Decree 95 targeting the country’s hydrocarbons sector. The policy, which also includes the proposed sale of assets such as Petroecuador’s 60 retail gasoline stations and issue of private concessions to operate Ecuador’s three state-run refineries, will reform the legal framework for production-sharing contracts. Among the changes would be the free and voluntary migration by private companies from service contracts to production-sharing contracts, the use of oil revenues to create a sustainability fund targeting social programs, and the assignment of some of Petroecuador’s producing fields to private companies.13
As outlined in the Executive Decree 95, the government plans to launch new risk-sharing contacts that are more equitable for private companies, allowing them to invest in field development and assume operational risks, in exchange for a share of production. President Lasso is pursuing more private investment to double Ecuador’s oil production from the current 500,000 b/d to 1 million b/d by 2025.14
Exploration and production
In 2020, Ecuador was the fifth-largest oil producer in South America behind Brazil, Colombia, Argentina, and Venezuela. Ecuadorian crude is produced in the Amazon in the eastern part of the country and transported by pipeline over the Andean mountains to the port of Esmeraldes. Ecuador's most productive oil blocks are located in the northeastern part of the country. The Ishpingo-Tambococha-Tiputini (ITT) fields are the country’s most prolific oil fields.
Ecuador produces two grades of oil: the 23°API Oriente, which accounts for two-thirds of total exports and is the main feedstock for domestic refineries, and Napo, which is a heavier grade at 17°API. Crude oil production increased in 2004 shortly after the opening of the Oleoducto de Crudos Pesados (OCP) pipeline, which removed a chokepoint on heavy crude oil transportation in the country. However, production subsequently leveled off as a result of natural decline, the lack of new project development, and operating difficulties at existing, mature oil fields.
In 2016, Petroamazonas took ownership of Operaciones Rio Napo, a joint venture between Petroecuador and Petroleos de Venezuela S.A. (PdVSA), Venezuela’s state-owned oil company.15 The remaining production is attributed to fields operated by international oil companies (IOCs), Repsol (Spain), Eni (Italy), Tecpetrol (Argentina’s state-owned company), and Andes Petroleum, which is a consortium of the China National Petroleum Corporation (CNPC, 55% share) and the China Petrochemical Corporation (Sinopec, 45% share).
Substantial oil reserves are located in the ITT fields in Yasuni National Park. The ITT fields, also known as Block 43, hold an estimated 4 billion barrels of oil reserves.16 The Tambococha-Tiputini fields are estimated to hold half of Ecuador’s total oil reserves, with the third field (Ishpingo) holding the rest. The Ecuadorean government placed a moratorium on oil extraction from these fields between 2007 and the summer of 2013 to protect biodiversity and to avoid dislocation of two isolated indigenous cultures. Subsequently, the development of hydrocarbon resources in the ITT fields was deemed of national interest and restarted.
Production began at the Tiputini field in September 2016. Tambococha started producing in 2018.17 In 2019, production at Block 43 ITT reached over 82,000 b/d, making it the highest oil producing block in Ecuador, surpassing the Auca, Shushufindi, and Sacha fields.18 The ITT fields, in the eastern Amazon Oriente Basin, are expected to average 60,000 b/d in 2021 as the country recovers from COVID-19 restrictions that disrupted oil production. Ecuador anticipates a significant increase in production by the end of 2021 as the Ishipingo field, the third and final piece of the development of the ITT block, comes online.19
Downstream
According to the Oil & Gas Journal, Ecuador has three commercial oil refineries with a combined capacity of 175,000 b/d. All three refineries are operated by Petroindustrial, a subsidiary of Petroecuador (Table 1).20 Through Petroindustrial, Petroecuador controls the country's crude processing capacity. Fuels are sold to various national and international retailers, with the government setting domestic retail fuel prices.
The largest refinery Esmeraldas is located on the Pacific coast and is connected to both export terminals and supply pipelines running from the Oriente fields. The other two facilities are Shushufindi and La Libertad.
Initially expected to come online in 2017, the construction of the 300,000 b/d Refineria del Pacifico (RPD) project planned under a strategic alliance between state oil company Petroecuador and Venezuelan national oil company Petróleos de Venezuela, S.A (PDVSA) in 2007 would have significantly increased domestic production of refined fuel. However, at the end of 2019, after years of delay, the project was cancelled. Currently available refining capacity is insufficient to meet domestic demand, resulting in Ecuador relying on imports of refined oil products. The country exports heavy (low-value) refined products, such as fuel oil and imports lighter (more costly) products such as gasoline, diesel, and jet fuel.
| Refinery | Crude oil distillation capacity thousand barrels per day |
Location |
|---|---|---|
| Esmeraldas | 110 | Esmeraldas |
| La Libertad | 45 | Santa Elena Peninsula |
| Shushufindi | 20 | Sucumbíos |
| Total | 175 | |
| Source: Table by the U.S. Energy Information Administration, based on data from the Oil & Gas Journal, Worldwide Refining Survey, January 1, 2021 | ||
In 2019, the government announced plans to build a new refinery on the Ecuadorian coast. According to media reports, six companies submitted proposals for the high conversion refinery with a planned capacity of 300,000 b/d. The project was included in the Executive Decree 861 issued in August 2019 which authorized MERNNR to execute the project for the design, construction, and operation of the refinery in the Costa region. According to the MERNNR, the project will be privately funded with the cost estimate of $6 billion.21
In October 2019, President Lenin Moreno removed fuel subsidies, which resulted in a week-long protest led by indigenous people. Protesters targeted oil facilities, which severely disrupted production of Petroamazonas and several private companies. The president reinstated fuel subsidies after one week of riots. On May 19, 2020, President Lenin Moreno signed the Executive Decree 1054, which established a market-based system for fuel pricing in Ecuador.22 The Executive Decree aims to end fuel subsidies, which were first introduced in 1970. Under the new regulation, the price for some fuels, including gasoline and diesel, is linked to the West Texas Intermediate futures price. The new regulation was implemented on July 1, 2020.23
Pipelines
Oil exports are one of Ecuador’s main sources of cash revenue. In 2019, the Ecuadorean government reported that 90% of all crude oil exports that were sent to Asia (mainly China) were for loan repayments. The loans were obtained by then-president Rafael Correa to finance social programs and infrastructure projects. These programs left Ecuador deeply in debt, and the government sought out a $10 billion loan from the International Monetary Fund (IMF) in 2019.24 In 2020, the IMF provided Ecuador with a $6.5 billion loan.25
Ecuador’s pipeline infrastructure is old and capacity is not fully utilized. Ecuador has two major crude oil pipeline systems (Table 2). The older and more widely used pipeline is the 310-mile Sistema Oleducto Trans-Ecuatoriano (SOTE) which transports light to medium crude oil (Oriente crude). Ecuador's second-largest oil pipeline is the Oleducto de Crudos Pesados (OCP), originally designed for heavy crude oil (Napo crude). About 70% of the country's crude oil travels through SOTE, with the remainder transported through OCP.
The 300-mile OCP flows mostly parallel to the SOTE pipeline. The OCP’s completion doubled Ecuador's oil pipeline capacity and facilitated increased production. In 2013, Ecuador and Columbia signed an agreement to use OCP’s spare capacity to transport southern Colombia oil to the Ecuadorian port of Esmeraldas. In June 2017, after almost 14 years of transporting only heavy crude oils, the OCP began transporting medium and light crude oils separately from heavy crude oils. This crude oil is largely produced from the Chaza Field in Colombia.26
| Name | Operational date | Route | Design capacity thousand barrels per day |
|---|---|---|---|
| SOTE | 1972 | Esmeraldes-Lago Agrio | 390 |
| OCP | 2003 | Esmeraldes-Lago Agrio | 450 |
| OBA | 2016 | Campo Platanillo (Colombia)- Víctor Hugo Rúales Station, Sucumbíos province (Ecuador) | 75 |
| OTA | 1970 | Lago Agrio (Ecuador)- Tumaco (Columbia) | 20 |
| Total capacity | 935 | ||
| Source: Table by U.S. Energy Information Administration, based on data from Fitch Solutions Ecuador Oil & Gas Report 2021, and Amerisur | |||
Ecuador has two transnational pipelines, one which is the 190-mile Oleoducto Transandino pipeline (OTA). The 20,000 b/d OTA pipeline connects Ecuador’s oil fields with the southern Colombian port of Tumaco.
The Oleoducto Binacional Amerisur (OBA) is a private pipeline owned by Amerisur that began transporting crude oil from southern Columbia to Ecuador in 2016, joining the Ecuadorean pipeline system to the port of Esmeraldas. The pipeline commenced operations with throughput capacity of 75,000 b/d.27 In 2019, Amerisur began transporting third-party crude oil through the OBA. The connection of Colombia's Putumayo fields to Ecuador is a source of imported supplies, serving demand in the northern region of Ecuador.
Natural Gas
Sector organization
In April 2019, President Moreno signed a decree introducing market-based prices of natural gas for industrial users over a certain volume threshold. The new law is targeted at the ceramics industry, which is one of the largest consumers of natural gas in Ecuador.28
Exploration and production
Ecuador produces relatively small volumes of natural gas. We estimate that the country’s natural gas production remained flat at 12 billion cubic feet (Bcf) in 2020. Ecuador’s low natural gas production is mainly the result of a lack of the infrastructure needed to capture and market natural gas. Exploration activities are mostly conducted by Petroamazonas (Ecuador’s national oil company, now called Petroecuador) although Andes Petroleum, ENAP, and PdVSA also participate in exploration.
Located in the Gulf of Guayaquil, the only non-associated natural gas project in Ecuador is the Amistad field. The field was discovered in 1970 but did not begin producing until 2002. In 2003, it was estimated to hold 173 Bcf of proved natural gas reserves. In 2012, the non-producing northern part of the field was reevaluated, and according to Petroecuador, could contain significantly more reserves than originally estimated.29 Almost all of Amistad’s natural gas production flows to the Machala facility, a 130-megawatt (MW) onshore, natural gas-fired power plant that supplies electricity to the Guayaquil region.
Electricity
Sector organization
Ecuador's national energy regulator, Consejo Nacional de Electricidad (CONELEC), was formed in October 1996. The Ecuadorian government passed the Act Establishing the Public Electric Power Service in 2015, which outlined the regulation of the Ecuadorian power sector. Under this act, CONELEC was rebranded as the Agencia de Regulación y Control de Electricidad (ARCONEL).
Empresa Pública Estratégica Corporación Eléctrica del Ecuador (CELEC) was created in 2010 by an executive decree that incorporated CELEC S.A. and Hidroeléctrica Nacional S.A. CELEC is the state-owned holding company engaged in the generation, transmission, distribution, commercialization, and import and export of electric power. CELEC has a portfolio of hydroelectric, thermal, and renewable energy projects.
CELEC consists of a transmission company Unidad de Negocios Celec EP Transelectric (Trans Electric), three hydroelectric generation companies (Hidronación, Hidropaute, and Hidroagoyán) and three thermal power generation companies (Termopichincha, Termoesmeraldas, and Electroguayas). Private-sector participation is allowed in electricity generation. In September 2021, the MERNNR announced the start of three Public Selection Processes for the concession to the private sector of the construction, operation, and maintenance of several projects of electric power generation and a transmission system. The projects will require a private investment of $1.9 billion, and MERNNR expects them to come online between 2024–2026.30
Ecuador's MERNNR was created in 2018 by merging the Ministry of Electricity and Renewable Energy (MEER) and the Ministry of Mining, and the Hydrocarbons Secretariat. MERNNR is responsible for developing relevant policy and promoting the development and sustainable use of energy and mineral resources.
El Operador Nacional de Electricidad (CENACE) is the grid operator of the electricity system on the mainland, the National Interconnected System (SNI). It manages energy transactions and ensures adequate operation of the grid. It is attached to the MERNNR. More than 200 power plants are operating in Ecuador, of which 89 provide power to the SNI.
Trans Electric is responsible for operating the transmission system that includes 45 substations; 1,143 miles of 230 kilovolt (kV) lines and 1,160 miles of 138 kV lines; has an installed transformation capacity of 8,918 mega volt ampere (MVA); and ensures open access for wholesale power market participants to transmission networks.
The state power distribution holding company, Corporación Nacional de Electricidad (CNE), is Ecuador’s largest energy corporation. The company is primarily engaged in the generation, distribution, and marketing of electricity, as well as the operation and maintenance of 10 substations and transmission line connections.
The Andean Electrical Interconnection System (SINEA), formed in 2011, created an Andean power corridor.31 Ecuador and Peru recently advanced plans to further integrate their power grids through the Connect 2020 program that provides policy support to develop the regulatory framework for cross-border power trade and transactions and financing for physical interconnections. The security of electricity supply is a risk in Ecuador as the country is prone to earthquakes, which can damage electricity grid infrastructure and power plants.
The government has stated that regional integration is necessary to ensure reliability in its power supply, as facilitating energy exchange with neighboring countries will improve the country’s electricity service. Ensuring energy supply capability has been identified as a challenge because many conventional generation units are under maintenance or idled. The lack of available generation in the near term is a concern in the periods where water is scarce, limiting hydroelectricity generation. Supporting regional integration, the Mercado Andino Eléctrico Regional (MAER), was supposed to be implemented in 2021, but as of the time of writing, it is not clear if MAER will be completed by the end of the year. In addition, the government has prioritized MAER’s ability to provide for the interchange of real-time data to aid regional integration.32
Projects
In 2017, state transmission company Trans Electric awarded two projects in a bidding round. The 230/69kV Quevedo-San Gregorio-San Juan de Manta transmission project was awarded to Chinese company Xian Electric Engineering. Construction began in August 2020. The 30kV Milagro-Babahoyo expansion project was awarded to Spanish company TSK Electrónica y Electricidad and became fully operational in 2019. The Coca Codo Sinclair hydroelectricity power plant began operations in 2016 and added 1,500 MW of generation capacity.33 The Coca Codo Sinclair plant is connected to the SNI. Power is delivered to the national grid through two 500kV transmission lines.
In May 2017, Trans Electric began operating the Chorrillos substation as part of the country’s 500 kV Transmission System project.34 The 500 kV Transmission System comprises 374 miles of 287 transmission lines operating at 500 kV, linking four new substations: San Rafael, located near the Coca Codo Sinclair power station; El Inga in the vicinity of Quito; Tisaleo, in the center of the country; and Chorrillos, near Guayaquil. This system incorporates cutting-edge technology and modern systems that are new technologies in the country. The system is complemented by 178 miles of 230 kV lines.35
According to the Fitch Solutions Key Projects Database, there are currently 10 power generation projects in Ecuador: four are still at planning stage, two are under construction, two are in the tendering phase, and two are at finance closure stage.36 Of Ecuador’s 10 power generation projects, 7 projects are hydropower although 2 projects have been suspended. The other projects are non-hydro renewables projects in the planning stage with the combined capacity of 306 MW. In terms of grid infrastructure projects, there are currently four: three are at the planning stage, and one is in the tendering phase.37
Hydropower has been Ecuador's dominant source of electricity generation since 2015. Hydroelectricity accounted for 79% of total generation in 2020, about 1% short of the goal outlined in the Matriz Energetica para 2020 program. Most of Ecuador’s hydroelectric capacity is located in Azuay province in the south-central highlands.
An over-reliance on hydropower makes the power sector vulnerable to generation deficits when water levels are low during the dry season, which spans from October to March. However, during periods of peak generation, its large hydropower capacity also enables Ecuador to be a net-electricity exporter to Colombia and Peru.
| Plant | Start date | Generating capacity (MW) |
|---|---|---|
| Coca Codo Sinclair | 2016 | 1,500 |
| Sopladora | 2016 | 487 |
| Delsitanisagua | 2018 | 180 |
| Minas-San Francisco | 2019 | 270 |
| Paute-Cardenillo | 2019 | 596 |
| La Union | 2019 | 80 |
| Source: Table by U.S. Energy Information Administration, based on Fitch Solutions and CELEC | ||
In October 2020, CELEC awarded a one-year contract to update its hydroelectric potential of medium- and large-scale projects (more than 25 MW).The work entails a review of 10 of 20 projects identified in 2018 for a combined 9 GW as part of a wider analysis of renewable energies to mitigate low water levels in the Amazon.38
| Plant | Expected start date | Generating capacity (MW) |
|---|---|---|
| Santiago | 2027 | 2,400 |
| Cardenillo | 2026 | 596 |
| Toachi-Pilatón | 2021 | 254 |
| Source: Table by U.S. Energy Information Administration, based on Fitch Solutions and CELEC | ||
The non-hydroelectric renewable energy sector in Ecuador is currently small, contributing about 3% to total power generation in 2020. The International Renewable Energy Agency reported that Ecuador had 28 MW of photovoltaic solar capacity as of 2020.39 Most of this comes from a 20 MW project commissioned in 2014. Development of wind generation capacity has lagged, with 21 MW reported as of 2020,40 from which 6.5 MW of that capacity came online in 2013 with the Villonaco I wind farm. Wind and solar penetration may grow as the governmental plans to provide support for renewables and increasing private investment in the sector. Ecuador’s government has identified nine priority projects or blocks of projects that would be seeking private investment—four of which include non-hydro renewables projects. The timeline for concessions of these projects has been pushed back because of the COVID-19 pandemic. Solarpack Corporación Tecnológica, S.A, the company awarded the contract for the construction, operation, maintenance of the 238-MW El Aromo photovoltaic solar project, expects it to come online in 2022,41 and the Villonaco II and III wind projects (46 MW and 56 MW) are under development.42
Notes
- Data presented in the text are the most recent available as of November 4, 2021.
- Data are EIA estimates unless otherwise noted.
Endnotes
- BN Americas, “Ecuador unveils 2016-40 national energy agenda,” October 12, 2016.
- Ministerio Coordinador de Sectores Estrategicos, “Agenda Nacional de Energia 2016–2040,”page 30.
- Facts Global Energy, Latin America Oil Monthly, August 4, 2021.
- Fitch Solutions, “Ecuador Oil & Gas Report,” 2021, page 67.
- Fitch Solutions, “Ecuador Oil & Gas Report,” 2021, page 9.
- AP News, “Ecuador buckles under virus, broken oil lines and old debt,” April 10, 2020.
- NY Times, “It Doesn’t Matter if Ecuador Can Afford This Dam. China Still Gets Paid,” December 24, 2018.
- Argus Media, “Ecuador to ink China oil-backed loan in Nov: Minister,” October 7, 2020.
- U.S. International Development Finance Corporation, “DFC and Ecuador Sign Framework Agreement to Support Development, Private Sector Investment,” January 14, 2021.
- Ministry of Economy and Finance, “Debt Bulletin Database July 2021,” see tab “Saldos De La Deuda Pública External.”
- Reuters, “Ecuador to quit OPEC in 2020 in search of bigger export revenue,” October 1, 2019.
- U.S. Department of State, “2021 Investment Climate Statements: Ecuador.”
- Ministry of Energy and Non-Renewable Natural Resources, “New Regulation of Hydrocarbon Operations promotes the increase in oil production,” July 19, 2021.
- Facts Global Energy, Latin America Oil Monthly, August 4, 2021.
- Reuters, “Ecuador's Petroamazonas to take over Sacha oilfield,” August 4, 2016.
- Newsbase Round-Up Global, Issue 78, September 2016, “First oil from Ecuador’s ITT project.”
- BN Americas, “At a Glance: Ecuador's Tambococha field,” February 26, 2018.
- BN Americas, “Block 43- ITT is positioned as the oil field with the highest production in Ecuador,” September 30, 2019.
- Fitch Solutions, “Ecuador Oil & Gas Report,” 2021, page 70.
- Oil & Gas Journal, “Worldwide Refining Survey" January 1, 2021.
- Hydrocarbon processing.com, “Ecuador seeks investor to build new refinery,” August 28, 2019.
- BN Americas, “Ecuador decrees the validity of the new Fuel Marketing System,” May 20, 2020.
- Fitch Solutions, “Ecuador Oil & Gas Report,” 2021, page 59.
- S&P Global Platts, “Ecuador's crude oil production, exports climb in March,” May 15, 2019.
- Argus Media, “Ecuador to ink China oil-backed loan in Nov: Minister,” October 7, 2020.
- OC Ecuador, “OCP enters a new phase with the transportation of Columbia’s segregated crude oil,” August 3, 2017.
- Amerisur Resources PLC (accessed September 20, 2021).
- Fitch Solutions, “Ecuador Oil & Gas Report,” 2021, page 28.
- Worldoil.com, “Ecuador expects to raise block 6 gas output by 61% next year,” Accessed July 29, 2017.
- Reuters, “Ecuador seeks $1.9 billion in private power generation investment,” September 20, 2021.
- US Department of State (Accessed September 28, 2021).
- The World Energy Council, Ecuador Member Profile (Accessed September 21, 2021).
- Ministerio de Electricidad y Energia Renovable, (Accessed September 20, 2021).
- BN Americas, “Chinese, Spanish firms land Ecuador transmission work,” July 28, 2017.
- Ministerio de Electricidad y Energia Renovable, (Accessed September 20, 2021).
- Fitch Solutions, “Ecuador Power Report,” page 29.
- Fitch Solutions, “Ecuador Power Report,” page 29.
- Fitch Solutions, “Ecuador Power Report,” page 8.
- International Renewable Energy Agency, “Renewable Capacity Statistics 2021,” page 22.
- International Renewable Energy Agency, “Renewable Capacity Statistics 2021,” page 15.
- Solarpack Corporación Tecnológica, S.A, “Solarpack wins a 20-year long PPA contract in Ecuador for a 258 MW solar PV project,” December 2019.
- Powermag, “Ecuador’s Power Grid Gets a Massive Makeover,” March 1, 2021.