Presented below are graphs and tables of the cost data for generators installed in 2024 based on data
collected by the 2024 Annual Electric Generator Report, Form EIA-860. The cost data for
certain generation technologies were omitted to avoid disclosure of individual company data.
EIA expects to publish construction cost data for generators installed in 2025 in September 2027.
Read EIA's Electric Power Data Guide.
Jump to group:
By selected sources and type:
Generators installed in 2024 by major energy source
| All plants by major energy source |
Capacity-weighted average cost ($/kW) |
| Solar |
1,865 |
| Battery storage |
1,469 |
| Wind |
1,882 |
| Natural gas |
1,004 |
| Petroleums liquids |
1,066 |
| Total capacity (MW) |
At new plants |
At existing plants |
| Solar |
30,265 |
579 |
| Battery storage |
10,195 |
904 |
| Wind |
4,455 |
436 |
| Natural gas |
1,061 |
805 |
| Petroleum liquids |
5 |
28 |
| Number of plants |
At new plants |
At existing plants |
| Solar |
672 |
9 |
| Battery storage |
154 |
16 |
| Wind |
26 |
2 |
| Natural gas |
15 |
13 |
| Petroleum liquids |
1 |
16 |
| All plants by major energy source |
Total cost (billion $) |
| Solar |
57.5 |
| Battery storage |
16.3 |
| Wind |
9.2 |
| Natural gas |
1.9 |
| Petroleum liquids |
0.0 |
| Number of generators by major energy source |
At new plants |
At existing plants |
| Solar |
679 |
12 |
| Battery storage |
164 |
17 |
| Wind |
27 |
2 |
| Natural gas |
66 |
23 |
| Petroleum liquids |
2 |
20 |
| Average new plants capacity or additional capacity At existing plants |
At new plants |
At existing plants |
| Solar |
45 |
64 |
| Battery storage |
66 |
57 |
| Wind |
171 |
218 |
| Natural gas |
71 |
62 |
| Petroleum liquids |
5 |
2 |
Generators installed in 2024 by prime mover
| Capacity-weighted average cost per kilowatt of installed namepate capacity ($/kW) |
Capacity weighted-average cost ($/kW) |
| Photovoltaic |
1,865 |
| Energy storage, battery |
1,469 |
| Onshore wind turbine |
1,882 |
| Combustion turbine |
841 |
| Internal combustion engine |
1,490 |
| Total included capacity(MW) |
At new plants |
At existing plants |
| Photovoltaic |
30,265 |
579 |
| Energy storage, battery |
10,195 |
904 |
| Onshore wind turbine |
4,455 |
436 |
| Combustion turbine |
699 |
719 |
| Internal combustion engine |
367 |
113 |
| Number of generators |
At new plants |
At existing plants |
| Photovoltaic |
679 |
12 |
| Energy storage, battery |
164 |
17 |
| Onshore wind turbine |
27 |
2 |
| Combustion turbine |
12 |
7 |
| Internal combustion engine |
56 |
36 |
| Average generator capacity at new or existing plants |
At new plants |
At existing plants |
| Photovoltaic |
45 |
48 |
| Energy storage, battery |
63 |
53 |
| Onshore wind turbine |
165 |
218 |
| Combustion turbine |
64 |
103 |
| Internal combustion engine |
7 |
3 |
| Total construction cost |
total cost (billion $) |
| Photovoltaic |
57.5 |
| Energy storage, battery |
16.3 |
| Onshore wind turbine |
9.2 |
| Combustion turbine |
1.2 |
| Internal combustion engine |
0.7 |
Generators installed in 2024 by Census region
| Census regions |
Capacity-weighted average cost ($/kW) |
| South |
1,463 |
| West |
1,642 |
| Midwest |
2,764 |
| Northeast |
2,465 |
| Total included capacity |
At new plants |
At existing plants |
| South |
22,461 |
1,222 |
| West |
15,116 |
1,326 |
| Midwest |
6,751 |
186 |
| Northeast |
1,652 |
16 |
| Number of plants |
At new plants |
At existing plants |
| South |
274 |
14 |
| West |
172 |
21 |
| Midwest |
143 |
13 |
| Northeast |
231 |
7 |
| Number of generators |
At new plants |
At existing plants |
| South |
310 |
19 |
| West |
239 |
27 |
| Midwest |
148 |
19 |
| Northeast |
241 |
9 |
| Average new plant or additional capacity At existing plants |
At new plants |
At existing plants |
| South |
82 |
87 |
| West |
88 |
63 |
| Midwest |
47 |
14 |
| Northeast |
7 |
2 |
| Census region |
Total cost (billion $) |
| South |
34.7 |
| West |
27.0 |
| Midwest |
19.2 |
| Northeast |
4.1 |
Generators installed in 2024 by top five states in capacity additions
| State |
capacity-weighted average cost ($/kW) |
| Texas |
1,260 |
| California |
1,759 |
| Florida |
1,556 |
| Arizona |
1,688 |
| Nevada |
1,368 |
| Total included capacity |
At new plants |
At existing plants |
| Texas |
13,078 |
1,137 |
| California |
6,575 |
293 |
| Florida |
3,154 |
76 |
| Arizona |
2,872 |
54 |
| Nevada |
1,530 |
665 |
| Number of plants |
At new plants |
At existing plants |
| Texas |
92 |
8 |
| California |
99 |
3 |
| Florida |
43 |
2 |
| Arizona |
12 |
3 |
| Nevada |
3 |
4 |
| Number of generators |
At new plants |
At existing plants |
| Texas |
125 |
10 |
| California |
133 |
3 |
| Florida |
43 |
4 |
| Arizona |
18 |
4 |
| Nevada |
8 |
6 |
| Average new plant or additional capacity At existing plants |
At new plants |
At existing plants |
| Texas |
142 |
142 |
| California |
66 |
98 |
| Florida |
73 |
38 |
| Arizona |
239 |
18 |
| Nevada |
510 |
166 |
| State |
total cost (billion $) |
| Texas |
17.9 |
| California |
12.1 |
| Florida |
5.0 |
| Arizona |
4.9 |
| Nevada |
3.0 |
Natural gas generators installed in 2024 by technology
| Natural gas plants by type |
Capacity-weighted average cost ($/kW) |
| Combustion turbine |
841 |
| Internal combustion engine |
1,522 |
| Total included capacity (MW) |
At new plants |
At existing plants |
| Combustion turbine |
699 |
719 |
| Internal combustion engine |
362 |
86 |
| Number of plants |
At new plants |
At existing plants |
| Combustion turbine |
3 |
5 |
| Internal combustion engine |
12 |
8 |
| Number of generators |
At new plants |
At existing plants |
| Combustion turbine |
12 |
7 |
| Internal combustion engine |
54 |
16 |
| Average new plants capacity or additional capacity At existing plants |
At new plants |
At existing plants |
| Combustion turbine |
233 |
144 |
| Internal combustion engine |
30 |
11 |
| Total construction cost |
Total cost (billion $) |
| Combustion turbine |
1.2 |
| Internal combustion engine |
0.7 |
Solar PV generators installed in 2024 by Census region
| Census regions |
Capacity-weighted average cost ($/kW) |
| South |
1,557 |
| West |
1,520 |
| Midwest |
2,899 |
| Northeast |
2,596 |
| Total included capacity |
At new plants |
At existing plants |
| South |
15,619 |
0 |
| West |
7,099 |
509 |
| Midwest |
6,058 |
70 |
| Northeast |
1,489 |
0 |
| Number of plants |
At new plants |
At existing plants |
| South |
193 |
0 |
| West |
118 |
4 |
| Midwest |
139 |
4 |
| Northeast |
222 |
1 |
| Number of generators |
At new plants |
At existing plants |
| South |
194 |
0 |
| West |
122 |
5 |
| Midwest |
140 |
6 |
| Northeast |
223 |
1 |
| Average new plant or additional capacity At existing plants |
At new plants |
At existing plants |
| South |
81 |
0 |
| West |
60 |
127 |
| Midwest |
44 |
17 |
| Northeast |
7 |
0 |
| Region |
Total cost (billion $) |
| South |
24.3 |
| West |
11.6 |
| Midwest |
17.8 |
| Northeast |
3.9 |
Solar PV generators installed in 2024 by top five states in capacity additions
| Census regions |
capacity-weighted average cost ($/kW) |
| Texas |
1,331 |
| Florida |
1,561 |
| California |
1,569 |
| Illinois |
2,029 |
| Ohio |
1,680 |
| Total included capacity |
At new plants |
At existing plants |
| Texas |
7,388 |
0 |
| Florida |
3,154 |
0 |
| California |
2,807 |
0 |
| Illinois |
1,710 |
0 |
| Ohio |
1,358 |
67 |
| Number of plants |
At new plants |
At existing plants |
| Texas |
35 |
0 |
| Florida |
43 |
0 |
| California |
64 |
0 |
| Illinois |
64 |
1 |
| Ohio |
8 |
2 |
| Number of generators |
At new plants |
At existing plants |
| Texas |
35 |
0 |
| Florida |
43 |
0 |
| California |
66 |
0 |
| Illinois |
64 |
1 |
| Ohio |
8 |
2 |
| Average new plant or additional capacity At existing plants |
At new plants |
At existing plants |
| Texas |
211 |
0 |
| Florida |
73 |
0 |
| California |
44 |
0 |
| Illinois |
27 |
0 |
| Ohio |
170 |
34 |
| State |
total cost (billion $) |
| Texas |
9.8 |
| Florida |
4.9 |
| California |
4.4 |
| Illinois |
3.5 |
| Ohio |
2.4 |
Solar PV generators installed in 2024 by PV panel type and tracking system
| Solar PV plants by tracking system |
Capacity-weighted average cost ($/kW) |
Crystalline silicon,
axis-based tracking |
1,903 |
Crystalline silicon,
fixed tilt |
2,529 |
Thin-film CdTe,
all types |
1,613 |
| Other |
1,851 |
| Total included capacity |
At new plants |
At existing plants |
Crystalline silicon,
axis-based tracking |
23,161 |
574 |
Crystalline silicon,
fixed tilt |
820 |
3 |
Thin-film CdTe,
all types |
5,772 |
0 |
| Other |
511 |
1 |
| Number of plants |
At new plants |
At existing plants |
Crystalline silicon,
axis-based tracking |
450 |
5 |
Crystalline silicon,
fixed tilt |
156 |
4 |
Thin-film CdTe,
all types |
46 |
0 |
| Other |
20 |
1 |
| Number of generators |
At new plants |
At existing plants |
Crystalline silicon,
axis-based tracking |
456 |
6 |
Crystalline silicon,
fixed tilt |
157 |
5 |
Thin-film CdTe,
all types |
46 |
0 |
| Other |
20 |
1 |
| Average new plant or additional capacity At existing plants |
At new plants |
At existing plants |
Crystalline silicon,
axis-based tracking |
51 |
115 |
Crystalline silicon,
fixed tilt |
5 |
1 |
Thin-film CdTe,
all types |
125 |
0 |
| Other |
26 |
1 |
| Solar PV plants by tracking system |
Total cost (billion $) |
Crystalline silicon,
axis-based tracking |
45.2 |
Crystalline silicon,
fixed tilt |
2.1 |
Thin-film CdTe,
all types |
9.3 |
| Other |
0.9 |
Solar PV generators installed in 2024 by total added capacity at plant
| Plant size |
Capacity-weighted average cost ($/kW) |
| 1–5 MW |
8,062 |
| 5–10 MW |
2,550 |
| 10–100 MW |
1,831 |
| Greater than 100 MW |
1,496 |
| Total included capacity |
At new plants |
At existing plants |
| 1–5 MW |
1,317 |
8 |
| 5–10 MW |
156 |
6 |
| 10–100 MW |
7,378 |
65 |
| Greater than 100 MW |
21,414 |
500 |
| Number of plants |
At new plants |
At existing plants |
| 1–5 MW |
425 |
5 |
| 5–10 MW |
22 |
1 |
| 10–100 MW |
124 |
1 |
| Greater than 100 MW |
101 |
2 |
| Number of generators |
At new plants |
At existing plants |
| 1–5 MW |
427 |
7 |
| 5–10 MW |
24 |
1 |
| 10–100 MW |
124 |
1 |
| Greater than 100 MW |
104 |
3 |
| Average new plant or additional capacity At existing plants |
At new plants |
At existing plants |
| 1–5 MW |
3 |
2 |
| 5–10 MW |
7 |
6 |
| 10–100 MW |
59 |
65 |
| Greater than 100 MW |
212 |
250 |
| Plant size |
total cost (billion $) |
| 1–5 MW |
10.7 |
| 5–10 MW |
0.4 |
| 10–100 MW |
13.6 |
| Greater than 100 MW |
32.8 |
Wind generators installed in 2024 by grid region
| Grid region |
capacity-weighted average cost ($/kW) |
| Texas |
1,944 |
| East |
1,941 |
| West |
1,736 |
| Total included capacity |
At new plants |
At existing plants |
| Texas |
1,585 |
350 |
| East |
1,516 |
0 |
| West |
1,355 |
86 |
| Number of plants |
At new plants |
At existing plants |
| Texas |
8 |
1 |
| East |
9 |
0 |
| West |
9 |
1 |
| Number of generators |
At new plants |
At existing plants |
| Texas |
9 |
1 |
| East |
9 |
0 |
| West |
9 |
1 |
| Average new plant or additional capacity At existing plants |
At new plants |
At existing plants |
| Texas |
198 |
350 |
| East |
168 |
0 |
| West |
151 |
86 |
| Grid region |
Total cost (billion $) |
| Texas |
3.8 |
| East |
2.9 |
| West |
2.5 |
Wind generators installed in 2024 by plant size
| Plant size |
Capacity-weighted average cost ($/kW) |
| 1–100 MW |
2,142 |
| Greater than 100 MW |
1,860 |
| Total included capacity |
At new plants |
At existing plants |
| 1–100 MW |
292 |
86 |
| Greater than 100 MW |
4,163 |
350 |
| Number of plants |
At new plants |
At existing plants |
| 1–100 MW |
5 |
1 |
| Greater than 100 MW |
21 |
1 |
| Number of generators |
At new plants |
At existing plants |
| 1–100 MW |
5 |
1 |
| Greater than 100 MW |
22 |
1 |
| Average new plant or additional capacity At existing plants |
At new plants |
At existing plants |
| 1–100 MW |
58 |
86 |
| Greater than 100 MW |
198 |
350 |
| Plant size |
Total cost (billion $) |
| 1–100 MW |
0.8 |
| Greater than 100 MW |
8.4 |
Wind generators installed in 2024 by wind class
| Class |
capacity-weighted average cost ($/kW) |
| Class 1 and 2 |
1,779 |
| Class 3 and 4 |
2,036 |
| Total included capacity |
At new plants |
At existing plants |
| Class 1 and 2 |
2,845 |
86 |
| Class 3 and 4 |
1,611 |
350 |
| Number of plants |
At new plants |
At existing plants |
| Class 1 and 2 |
16 |
1 |
| Class 3 and 4 |
10 |
1 |
| Number of generators |
At new plants |
At existing plants |
| Class 1 and 2 |
16 |
1 |
| Class 3 and 4 |
11 |
1 |
| Average new plant or additional capacity At existing plants |
At new plants |
At existing plants |
| Class 1 and 2 |
178 |
86 |
| Class 3 and 4 |
161 |
350 |
| Plant size |
total cost (billion $) |
| Class 1 and 2 |
5.2 |
| Class 3 and 4 |
4.0 |
Notes:
- Data includes facilities with a total generator nameplate capacity of 1 megawatt (MW) or more. Solar data does not include distributed generation capacity.
- Government grants, tax benefits, or other incentives are excluded from these costs.
- Solar photovoltaic (PV) data are based on reported alternating current (AC) capacity and may differ from other cost and capacity estimates that use direct current (DC) ratings of PV panels.
- Petroleum liquids includes distillate fuel oil, jet fuel, kerosene, residual fuel oil, and waste oil.
- Biomass includes both liquid and gaseous biomass fuels.
- Some generation technologies were excluded from this analysis to avoid disclosure of individual company data.
- Average construction cost is based on the nameplate capacity weighted average cost per kilowatt of installed nameplate capacity.
- Total capacity is the sum of the nameplate capacity of generators included in each group.
- Average new capacity is based on the nameplate capacity of new plants or new additions of nameplate capacity to existing plants. New plants did not previously have operable units and are typically recently constructed. Existing plants have at least one previously operable generator and are not newly constructed.
- Totals may not equal sum of components due to independent rounding.
Data source: U.S. Energy Information Administration, Form EIA-860, Annual Electric Generator Report