| Coal | Natural gas | Petroleum and other liquids | Nuclear | Hydro | Renewables and other | Total | |
|---|---|---|---|---|---|---|---|
| Primary energy consumption (quads) | 0.0 | 0.0 |
0.2 | 0.0 | 0.0 | 0.3 | |
| Primary energy consumption (percentage) | 0% | 14% | 72% | 0% | 14% | 100% | |
| Primary energy production (quads) | 0.0 | 0.2 | 2.5 | 0.0 | 0.0 | 2.7 | |
| Primary energy production (percentage) | 0% | 8% | 90% | 0% | 2% | 100% | |
| Electricity generation (terawatthours) | 0.0 | 1.7 | 2.6 | 0.0 | 13.3 | 0.4 | 17.9 |
| Electricity generation (percentage) | 0% | 9% | 14% | 0% | 74% | 2% | 100% |
|
Data source: U.S. Energy Information Administration, International Energy Statistics database |
|||||||
| Crude oil grade | API gravity number (degrees) | Sulfur content (percentage) | Notes | |||
|---|---|---|---|---|---|---|
| Cabinda | 32.0 | 0.12 | Medium, sweet crude oil grade | |||
| Dalia | 23.7 | 0.49 | Medium, sweet crude oil grade | |||
| Girassol | 30.8 | 0.34 | Medium, sweet crude oil grade; produced at Girassol and Jasmin fields | |||
| Hungo | 28.5 | 0.71 | Medium, semisweet crude oil grade; produced at Hungo and Chocalho (Block 15) | |||
| Kissanje | 28.2 | 0.44 | Medium crude oil grade; medium sulfur content | |||
| Kuito | 19.0 | 0.68 | Heavy crude oil grade, medium sulfur content; produced at Block 14 | |||
| Nemba | 38.7 | 0.19 | Light, sweet crude oil grade; produced at Block 0 | |||
| Palanca | 37.2 | 0.18 | Light, sweet crude oil grade; blend of five different oil fields | |||
| Xicomba | 34.8 | 0.39 | Light, sweet crude oil grade; produced at Block 15 | |||
|
Data source: Sonangol company website |
||||||
| Refinery | Location | Status | Estimated start date | Nameplate capacity (barrels per day) | ||
|---|---|---|---|---|---|---|
| Luanda | Luanda | Operating | 1958 | 72,000 | ||
| SonaRef | Lobito | Under development | 2025 | 200,000 | ||
| Soyo | Soyo | Under development | 2025 | 100,000 | ||
| Malongo (phase 1) | Cabinda | Under development | 2025 | 30,000 | ||
| Malongo (phase 2) | Cabinda | Under development | 2026 | 30,000 | ||
| Total | 432,000 | |||||
|
Data source: International Trade Administration and Energy Capital & Power |
||||||
| Refinery | Location | Status | Estimated start date | Nameplate capacity (barrels per day) | ||
|---|---|---|---|---|---|---|
| Baynes hydropower project | Kunene River | Planning | Unknown | 881 | ||
| Caculo Cabaça hydropower project | Kwanza River Basin | Under construction | 2026 | 2,170 | ||
| Cambambe hydropower project | Kwanza River Basin | Operational | 1962 | 972 | ||
| Laúca hydropower project | Kwanza River Basin | Operational | 2017 | 2,071 | ||
| Total | 6,094 | |||||
|
Data source: International Trade Administration, Power Technology, and Energy Capital & Power |
||||||