June 1, 2012

Reserve electric generating capacity helps keep the lights on

map of Regional reserve margin estimates and targets for summer 2012, as described in the article text
Source: U.S. Energy Information Administration, based on North American Electric Reliability Corporation, 2012 Summer Short-Term Reliability Assessment.

The electricity utility industry employs a simple strategy for maintaining reliability: always have more supply available than may be required. Yet it can be difficult to forecast future electricity demand, and building new generating capacity can take years. The industry regularly monitors the supply situation using a measure called reserve margin. Regional estimates of reserve margins are compared to pre-determined target levels to assess supply adequacy.

Reserve margin is (capacity minus demand)/demand, where "capacity" is the expected maximum available supply and "demand" is expected peak demand. It is calculated for electric systems or regions made up of a number of electric systems. For instance, a reserve margin of 15% means that an electric system has excess capacity in the amount of 15% of expected peak demand. The map shows 14 regional reserve margin estimates and the target reserve margins for summer 2012, which are derived from the North American Electric Reliability Corporation's (NERC) recently-released 2012 Summer Short-Term Reliability Assessment. NERC Regional Entities set their region's target reserve margin.

The reserve margin estimates exceed the target in every region, except in ERCOT (most of Texas). Southeastern and Mid-Atlantic regions currently have reserve margins well above their region's target level, indicating significant excess capacity.

The Texas heat wave in August 2011 led to a supply emergency that illustrates the importance of reserve capacity. The 2011 Summer Short-term Reliability Assessment projected ERCOT total internal demand would be equally likely to be above or below 64,964 megawatts (MW). An unprecedented heat wave drove demand to record levels: 68,294 MW, or over 5% above the level quoted in the Summer Assessment. Reserve margins are maintained, at significant cost, for just such unanticipated emergencies. Operators were able to avoid loss of customer load (a blackout), but the ERCOT system used nearly all of its reserve generating capacity.

Each fall NERC issues an annual Long-Term Reliability Assessment that presents a ten-year outlook addressing issues related to the reliability of the bulk power system. NERC also issues Summer and Winter Short-Term Reliability Assessments in May and October, respectively, that present estimates for the upcoming peak demand season. These assessments highlight reserve margin estimates.