Last Updated: May 21, 2026
Guam imports petroleum products to meet almost all of its energy needs.
Guam is the southernmost and largest of the Mariana Islands, located in the Pacific Ocean about 5,800 miles west of San Francisco and 1,600 miles east of Manila, Philippines.1 The island became a U.S. territory in 1898 and is home to the indigenous Chamorro people.2 Guam is close to the International Date Line. As a result, it is the first place in the United States to see each new day, which is why Guam is known as the place “Where America’s Day begins.”3 Guam has no fossil energy resources and meets nearly all of its energy needs—including the fuel for generating most of its electricity—with imported petroleum products.4,5,6 However, Guam is aiming to increase its use of renewable energy resources for electricity generation.7
Surrounded by coral reefs, Guam sits on the southern edge of the Mariana Trench and is near the Challenger Deep, which lies nearly 7 miles below the surface of the Pacific Ocean and is the deepest known place on earth. Guam, as with the other Mariana Islands, is the top of an undersea mountain, part of a volcanic subsea range stretching northwest toward Japan.8,9 At 36 miles long and 6 to 12 miles wide, the territory has about three times the land area of Washington, DC.10,11 Guam is a tropical island and has a climate that is warm and humid with little variation in seasonal temperatures that range between 70oF and 90oF throughout the year. The rainy season runs from May to November and can bring devastating typhoons.12,13 The Category 4 Typhoon Mawar, which struck the northern coast of Guam in May 2023 with winds up to 140 miles per hour, was the strongest typhoon to hit Guam since 2002 and left much of the island’s residents without power.14,15
Guam has a population of about 154,000, plus about 24,000 U.S. military personnel and their families.16,17 Tourism and the U.S. military are the largest contributors to Guam's economy.18 In 2025, Guam had about 783,000 visitors, which is still well below the 1.7 million visitors to the island in 2019 prior to the COVID-19 pandemic. Almost four-fifths of the island’s tourists arrive from South Korea and Japan.19 The U.S. military relocated thousands of its personnel from Okinawa, Japan, to the Marine Corps Base Camp Blaz.20,21 The military owns about 25% of the island and accounts for about one-fifth of Guam's energy consumption.22
Motor gasoline and diesel fuel account for most of Guam’s petroleum consumption.
Guam has no crude oil reserves, petroleum production, or refineries.23,24 The island’s only port, located at Apra, receives all of the territory’s imported petroleum products, which come primarily from Asia.25,26 Sales of diesel fuel—used mostly to generate electricity—make up 37% of Guam’s petroleum sales. Motor gasoline accounts for 34% of petroleum sales on the island. Jet fuel accounts for 26% and propane makes up most of the rest of the island’s petroleum sales.27,28
In 2024, fossil fuels provided 91% of Guam’s electricity generation, with the remainder provided by renewables.
The Guam Power Authority (GPA), a public corporation overseen by the elected Consolidated Commission on Utilities (CCU) and regulated by the Guam Public Utilities Commission (PUC), provides all of Guam’s electricity. GPA owns and manages the island's electric grid, which is made up of 1,839 miles of transmission and distribution lines. The utility has about 54,000 customers, with the U.S. Navy being the single largest customer, making up about 18% of the utility’s revenues. GPA has 354 megawatts of generation capacity, of which over 85 megawatts are from renewable sources.29 In 2024, fossil fuels provided 91% of Guam’s electricity generation. Renewables, primarily solar, provided the remainder.30
GPA continues to rebuild and expand its generating assets after several natural disasters and receiving approval from regulators for a new power plant. The new 198-megawatt Ukudu replacement power plant can run on both ultra-low sulfur diesel fuel and liquefied natural gas (LNG). The plant was scheduled to come online in 2024, but damage caused by Typhoon Mawar in 2023 delayed the plant’s start up and it came online in December 2025.31,32 Separately, GPA is looking to add more renewable energy generation and battery energy storage over the next several years that will help offset the loss of the Cabras plant’s generating capacity due to an explosion and meet its clean energy goals. The remaining two generating units at the Cabras plant are expected to be retired by 2026.33
Guam’s residential electricity costs, including fuel surcharges, are about two times higher than the U.S. average, although Guam’s residential electricity rates are typically one of the lowest among the nearby Pacific islands. In 2024, Guam’s average residential electricity price was $0.35 per kilowatthour, compared to the average U.S. rate of $0.16 per kilowatthour.34,35 Because petroleum products generate nearly all of Guam’s electricity, GPA imposes a fuel surcharge, the Levelized Energy Adjustment Clause, that can be adjusted every six months to reflect changes in petroleum costs.36,37
GPA had about 54,000 electricity customers in 2024.38 The residential sector was the largest consumer of electricity in 2024 and accounted for about 35% of the island’s electricity use. The commercial sector, which includes hotels, restaurants, and private office buildings, accounted for 33%. The U.S. Navy accounted for about 21% of electricity use and the Guam government accounted for 11%.39
Guam’s Renewable Portfolio Standard aims to have 100% of its electricity sales generated by renewables by 2045.
In 2008, Guam's legislature enacted a renewable energy portfolio standard (RPS) goal for renewable sources to generate 8% of the island’s electricity sales by the end of 2020. The renewable goal would increase to 10% of electricity sales by 2025 and to 25% by 2035.40 In 2019, Guam’s legislature updated the voluntary standard so renewables would provide 50% of the island’s electricity sales by 2035 and 100% by 2045. The RPS recognizes solar, wind, biomass, wave energy, and ocean thermal energy as acceptable renewable sources to meet the standard.41,42 In 2024, renewables accounted for about 9% of Guam’s electricity generation.43
In 2015, the 25-megawatt Dandan solar farm came online, Guam’s first commercial solar photovoltaic (PV) facility. The solar PV facility can generate enough electricity to serve an estimated 10,000 homes.44 The 60-megawatt Mangilao solar farm came online in 2022. A second 40-megawatt solar farm was cancelled by the GPA in March 2025.45,46 In 2024, under its Phase IV bidding round, GPA received five bids from energy companies to provide over 330 megawatts of new renewable generating capacity with battery storage systems.47 One of these projects is the Yona Solar Power Project, a 132-megawatt solar farm with battery storage, is currently under construction and is scheduled to come online in 2028. When completed, it will become the largest solar farm in Guam.48
Guam has substantial wind power potential but also has unique wind turbine siting issues. The island is seismically active and is in the Pacific's Typhoon Alley, so wind turbines must be engineered to withstand both earthquakes and typhoon-force winds. Wind turbine siting must also consider impacts on military facilities, endangered species, and other local environmental concerns. Another challenge is maintaining reliability of the island's small electric grid given the variability of wind power.49,50 Several potential wind energy sites have been identified by the GPA and the U.S. Department of Interior announced a call for interest.51,52 However, in January 2025, the federal government temporarily withdrew all federal offshore areas from leasing for wind energy development.53
GPA offers net metering and pays its customers for surplus power they generate from small-scale solar, wind, and other customer-sited renewable generation installations. The surplus power is distributed on the island’s grid. All new net metering systems connected to the grid after June 1, 2020, are required to have energy storage batteries with at least one hour of storage capacity to improve the reliability of electricity supplies.54,55
Guam has no natural gas reserves and does not produce or use natural gas.56,57 In December 2025, GPA began operating the 198-megawatt Ukudu power plant that is capable of burning either imported ultra-low sulfur diesel fuel or LNG that is regasified to generate electricity. The GPA has asked the Department of War to cover the $210 million cost to build an LNG terminal for the Ukudu power plant at Tanguisson beach in Dededo. The plant will switch to LNG once the necessary infrastructure is completed.58,59,60
Guam has no coal reserves and does not produce or use coal.61,62
1 Britannica, Guam, updated March 25, 2026.Endnotes
2 Pacific RISA, Territory of Guam, accessed April 2, 2026.
3 Guam Economic Development Authority, About Guam, accessed April 2, 2026.
4 U.S. Energy Information Administration (EIA), International Energy Statistics, Guam, 2024 primary energy data in quadrillion Btu, Total Energy.
5 U.S. EIA, International Energy Statistics, Guam, Electricity, Generation (billion kWh), Download Export CSV (table), 1980¬–2024.
6 National Laboratory of the Rockies, Guam Energy Baseline Report (May 2024), National Renewable Energy Laboratory, p. vi–vii.
7 Guam Power Authority, 2024 Annual Report, Regional Rate Comparison, As of September 30, 2024, p. 22–23.
8 Pacific Islands Ocean Observing System, Education resources, Guam, Geologic Setting, accessed April 2, 2026.
9 Wattles, Jackie, and Amaya McDonald, “6 incredible facts about the Challenger Deep, the deepest point on Earth,” CNN (June 23, 2023).
10 Commander Joint Region Marianas, Naval Base Guam, Welcome to Naval Base Guam, accessed April 2, 2026.
11 Guam Portal, How Big is Guam Island?, updated January 2, 2025.
12 Guampedia, Geography of Guam, Climate, accessed April 2, 2026.
13 Britannica, Guam, Land, updated March 25, 2026.
14 National Oceanic and Atmospheric Administration, “NWS Guam Assessment on Typhoon Mawar: Timing, Characteristics & Impact to Guam, 24–25 May 2023,” Press Release (July 14, 2023).
15 Garces Bordallo, Grace and Jennifer Sinco Kelleher, “Typhoon Mawar leaves behind ‘major mess’ in Guam, thousands without power,” PBS News (May 25, 2023).
16 Military Installations, Joint Region Marianas - Naval Base Guam, Installation Details, Population, accessed April 3, 2026.
17 U.S. Census Bureau, 2020 Island Areas Censuses Data on Demographic, Social, Economic and Housing Characteristics Now Available for Guam, updated October 20, 2022.
18 Government of Guam, The Bureau of Statistics and Plans, 2024 Guam Statistical Yearbook, p. 3.
19 Guam Visitors Bureau, Preliminary Visitor Arrival Summary December 2025, p. 4, 6.
20 Governor of Guam, 2026 Executive Budget Request, The Leon Guerrero-Tenorio Administration, p. 28.
21 The United States Marine Corps, “Camp Blaz Marines and Sailors Move Into New Barracks,” Press Release (May 19, 2025).
22 National Laboratory of the Rockies, Guam Energy Baseline Report (May 2024), National Renewable Energy Laboratory, p. 1.
23 U.S. EIA, Guam Profile Data, Reserves, Production, accessed April 1, 2026.
24 U.S. EIA, Number and Capacity of Petroleum Refineries, Guam, as of January 1, 2025.
25 Port Authority of Guam, About PAG and Facts & Figures, accessed April 1, 2026.
26 National Laboratory of the Rockies, Guam Energy Baseline Report (May 2024), National Renewable Energy Laboratory, p. 5–6.
27 U.S. EIA, Guam Profile Data, Consumption by Source, accessed April 21, 2026.
28 Guam Energy Office, Fuel Sales by Petroleum Companies, Fuel Sales by Petroleum Companies 2024.
29 Guam Power Authority, 2024 Annual Report, GPA FY 2024 Overview, p. 10, 12–13, F4.
30 U.S. EIA, International Energy Statistics, Electricity, Guam, Generation (billion kWh), Download Export CSV (table), 1980–2024.
31 Guam Power Authority, 2024 Annual Report, p. 11, 22, F13.
32 “GPA announces commissioning of Ukudu power plant,” Mariana Business Journal (December 29, 2025).
33 Guam Power Authority, 2024 Annual Report, p. 3–4, 22, F30.
34 U.S. EIA, Electric Power Annual (October 16, 2025), U.S. Territories, Table 12.6, and Electricity Sales, Table 2.4.
35 Guam Power Authority, 2024 Annual Report, Regional Rate Comparison, As of September 30, 2024, p. 14.
36 U.S. EIA, International Energy Statistics, Electricity, Guam, Generation (billion kWh), Download Export CSV (table), 1980–2024.
37 Guam Power Authority, Levelized Energy Adjustment Clause (LEAC), accessed April 12, 2026.
38 U.S. EIA, Electric Power Annual (October 16, 2025), U.S. Territories, Table 12.6.
39 Guam Power Authority, 2024 Annual Report, Attachment: Supplementary Information and Other Information, Years Ended September 30, 2024 and 2023, Schedule of Sales of Electricity, Annual Electric Sales in kWh, p. F70.
40 Office of the Governor of Guam, Bill No. 166 (EC), 2007, p. 2–3.
41 DSIRE, NC Clean Energy Technology Center, Guam-Renewable Energy Portfolio Goal, updated December 9, 2025.
42 National Laboratories of the Rockies, Guam100 – Guam’s 10% Renewable Energy Future (September 2024).
43 U.S. EIA, International Energy Statistics, Electricity, Guam, Generation (billion kWh), Download Export CSV (table), 1980–2024.
44 O’Connor, John, “Opening ceremony held for Dandan solar facility,” The Guam Daily Post (October 7, 2015).
45 Guam Power Authority, “KEPCO Breaks Ground, Cuts Ribbon on Power Projects,” Press Release (July 20, 2022).
46 Taitano, Joe, “GPA cancels salvaged solar project,” Pacific Daily News (March 22, 2025).
47 Guam Public Utilities Commission, Guam Power Authority’s Phase IV Renewable Energy Acquisition Award, GPA Docket No. 26-02, p. 1–2, Exhibit 1 p. 19 of 44, accessed March 30, 2026.
48 Jowett, Patrick, “Korean bank backs Guam’s largest solar project,” pv magazine (December 24, 2025).
49 Pacific Northwest National Laboratory, “Less Salty Ocean is Right up Typhoons’ Alley,” January 4, 2017.
50 Baring-Gould, Ian and Misty Conrad, Guam Initial Technical Assessment Report, National Renewable Energy Laboratory, NREL/TP-7A40-50580 (April 2011), p. 30, 31.
51 Baring-Gould, Ian and Misty Conrad, Guan Initial Technical Assessment Report, National Renewable Energy Laboratory, NREL/TP-7A40-50580 (April 2011), p. 37, 72–73.
52 U.S. Department of Interior, Bureau of Ocean Energy Management, Guam Activities, accessed March 31, 2026.
53 “Trump directive halts Guam’s ocean wind farm initiative,” Islands Business (January 31, 2025).
54 NC Clean Energy Technology Center, DSIRE, Guam–Net Metering, updated March 25, 2026.
55 O’Connor, John, “CCU approves battery requirement for solar-powered homes.” The Guam Daily Post (February 27, 2020).
56 National Laboratory of the Rockies, Guam: 2023 Energy Baseline Report, (May 2024), National Renewable Energy Laboratory, p. 1.
57 U.S. EIA, International Energy Statistics, Guam, Dry natural gas production (bcf) and Dry natural gas consumption (bcf), 2024.
58 “GPA announces commissioning of Ukudu power plant,” Mariana Business Journal (December 29, 2025).
59 K&M Advisors, “K&M Advisors Support Guam’s Ambitious Energy Transition Plans with LNG Infrastructure Development,” Press Release (October 2, 2024).
60 Taitano, Joe, “GPA asks military to fund $210M liquid natural gas terminal at Tanguisson,” Pacific Daily News (January 23, 2026).
61 U.S. EIA, International Energy Statistics, Guam, Coal and coke, Production and Consumption, 2024.
62 U.S. EIA, International Energy Statistics, Guam, Coal and coke, Coal reserves, 2023.