Energy Information Administration Forecast Channel.  If having trouble viewing this page, contact the National Energy Informaiton Center at (202) 586-8800.
Home >Modeling and Analysis Papers> Modeling Distributed Electricity Generation
 


Modeling Distributed Electricity Generation in the NEMS Buildings Models

Table 3.  Total Installed Costs for Distributed Generation Technologies in the 
Advanced Technology Case by Year of Introduction, 2000-2020

Technology

2000-2004

2005-2009

2010-2014

2015-2020

Cost
(1998 Dollars per Kilowatt)

Percent Difference from Reference Case

Cost
(1998 Dollars per Kilowatt)

Percent Difference from Reference Case

Cost
(1998 Dollars per Kilowatt)

Percent Difference from Reference Case

Cost
(1998 Dollars per Kilowatt)

Percent Difference from Reference Case

PV

5,529

3,840

-8

3,000

-6

1,750

-28

Fuel Cell

3,625

2,400

-20

1,940

-20

1,293

-25

Gas Microturbine

800

560

-20

560

-20

560

-20

Sources: Office of Integrated Analysis and Forecasting. PV costs approximate the industry “road map.” Fuel cells costs are approximately 20 to 25 percent lower than reference case levels based on industry projections. Microturbine estimates are by assumption.

E-Mail Subscription

EIA Home 
Contact Us

Page last modified on