Energy Information Administration Forecast Channel.  If having trouble viewing this page, contact the National Energy Informaiton Center at (202) 586-8800.
Home >Modeling and Analysis Papers>The Electric Transmission Network: A Multi-Region Analysis
 


The Electric Transmission Network: A Multi-Region Analysis

Table 3.  Summary Results for Five Analysis Cases

Summary Result

FERC
Base Case

Peak Demand

Shoulder Demand

Reference

Super Region

Reference

Super Region

Hourly System Cost: NEPOOL, NYPP, MAAC, ECAR (Million 1995 Dollars)

2.529

2.529

2.519

1.858

1.856

Total Dispatch (Gigawatts)

165.162

165.174

165.192

131.743

131.817

NEPOOL Dispatch (Megawatts)

18,917

18,893

18,677

14,537

14,173

NEPOOL Imports (Megawatts)

622

622

861

622

995

Gross Interregional Trade (Megawatts)

8,540

8,540

8,737

8,120

11,980

Source: Office of Integrated Analysis and Forecasting, PowerWorld® model runs FERC BASE CASE.D022800, ADMINTRADEWMILL.D022800, FREETRADEWMILL.D041000, REFERENCE80.D042400, and FREETRADEWMILL80. D042400.

 

E-Mail Subscription

EIA Home 
Contact Us

Page last modified on
Return to Energy Information Administration Home Page