Electric Power Annual   Revision                                        

Final Data for 2011 Released: January 30, 2013
Revison Date: May 16, 2013

May 16, 2013

Data revision.

  • 2011 Total (all sectors) and electric utility sector existing net summer capacity for petroleum capacity was understated by 274 MW. These data have been revised upward in the following tables:
    • Table 1.2
    • Table 4.2a
    • Table 4.2b
    • Table 8.5
    • Table 9.2
    • Table 9.3

March 19, 2013

Data revision.

  • Peak reduction units revised in Tables 10.2 and 10.4.


Contact: Electricity data experts